1001 Typical Details - Standard Densiphalt construction, depths of layers dependant on loadings/vehicle movements.
1002 Manhole - Detail of hanching to manhole or gully. Haunch to manhole to be kept 75mm below finished level and continuous to avoid grout ingress.
1003 Overlay on concrete - Overlay on concrete. Plane out existing concrete to required depth lay Open Graded Asphalt and apply mortar,saw cut joint and seal.
1004 Fulldepthconstruction - Full depth reconstruction, break out existing concrete,lay base coarse, lay Open Graded Asphalt and apply mortar,saw cut joint and seal.
1005 ExternalInterface - Detail of interface with a building or other obstruction. To enable the surface of the Densiphalt to be finished and compacted a formed edge should be provided.
1006 Densit- Conc - At the junction of a new flexible Densiphalt construction and an existing concrete slab a flexible joint should be installed.
1007 Internal wall - Internal floors can be laid prior to partitions being installed and then fixed to the floor using expanding bolts or other propriety fixings and the fixed to the partition.
1008 HoldingDown - Shelving can be fixed to a Densiphalt internal installation by post drilling and fixed down using chemical anchors.
1009 DrainageChannel - At the junction of a Densiphalt surface and a drainage channel to a avoid cracking a flexible joint can be introduced by saw cutting after construction and filling with a flexible joint filler.
1010 JuncInt-Ext - At the junction of a building and an external installation the external construction should be kept separate from the building.
1011 BlockPaving-Densiphalt - Detail showing junction between a slab/block paving and a Densiphalt installation. If the Densiphalt surface is installed first a fixed edge must be provided at the junction.