1013 Armco Fixing - Armco barrier support posts can be fixed to a Grouted Macadam installation by post drilling and fixed down using chemical anchors.
1014 Dock leveller - Mild steel angle fixed to an existing formed edge to enable a CIP overlay to be installed.
1016 Junction CBM - Where a new Grouted Macadam surface is laid over a junction of two different base coarse materials a flexible joint in the surface should be introduced.
1017 Formed Edge - Where no permanent fixed edges are installed a steel angle should be fixed to give an edge to work to.
1019 Armco support post - When laying a CIP overlay adjacent to an existing Armco Barrier or other support post the joint should post cut and sealed with flexible joint filler.
1020 Concrete Ramp- CIP - At the junction of a new flexible CIP construction and an existing or new concrete slab a flexible joint should be installed.
1130 Bauxite Topping - To give a more durable surface finish in aggressive environments a Bauxite surface scatter and scrape coat can be introduced. As the mortars are spread a 0-3mm bauxite aggregate is scattered over the surface. It is allowed to cure for 24hrs then a scrape coat of mortar is applied to the surface.
.
|